What makes Berlijnplein unique?
The whole is greater than the sum of its parts. Berlijnplein’s culture cluster houses a wide range of cultural, creative, and community organisations. These organisations come together around the theme ‘The Future of the City’ to create a groundbreaking and diverse programme for a broad audience, young and old, from Leidsche Rijn, the city, and beyond. It’s a programme by and for everyone. Connection and collaboration are the starting point, with each other and the target audience.
Who is Berlijnplein for?
Berlijnplein has its roots in Leidsche Rijn. The culture cluster programmes with and for a broad group of people from the neighbourhood, the city, and beyond. This doesn’t mean that everything you see and do at Berlijnplein is aimed at a broad audience. Sometimes, it will be an activity for young and old, from Leidsche Rijn and the city. Other times it will be an activity with national or international appeal aimed at a specific group of interested parties. Both are possible, as long as the overall programming considers the broad audience.
What happens at Berlijnplein?
There’s always something happening at Berlijnplein: it’s always open. The outdoor exhibitions are accessible 24/7. You can always join one of the picnic tables. The neighbourhood restaurant Venster is open from Wednesday to Sunday from 11 am. In addition to these ongoing activities, there are changing programmes: from theater, dance, visual arts, workshops, debates, and much more.
Who is located at Berlijnplein?
Berlijnplein houses a wide range of cultural, community, and innovative organisations. RAUM started at this location in 2017. In 2019, DePlaatsmaker began as a pioneer and manager of a temporary collective building on Berlijnplein, and NUT (Nieuw Utrechts Toneel), Goede Vrijdag, Jonge Honden, and Buurtwerkkamer established themselves at Berlijnplein. Three dance companies, 155, IRC, and SHIFFT, are also already part of Berlijnplein and will collectively form the core of the Dance House in the new construction. IRC and 155 will soon move to a temporary studio in the Canal Cellars next to Berlijnplein. In the coming years, many more creative makers and organisations will join this place.
What’s coming to Berlijnplein?
Berlijnplein is a cultural new construction development of 9,200 m2. The culture cluster will feature spaces for public programmes and work and development spaces. The buildings and public space will facilitate creativity, innovation, and interaction. The culture cluster will be built and operated in a circular and energy-neutral manner, with a flexible setup to adapt to changing needs.
What does the new design of Berlijnplein look like?
The Preliminary Design of the Berlijnplein Cultural Cluster was submitted in December 2023 by the PleinR consortium. The Berlijnplein Cultural Cluster will be a vibrant and sustainable cultural hub for Leidsche Rijn. It will feature exhibition spaces, studios, music studios, rehearsal and presentation spaces for dance and theater. Additionally, there will be provisions for catering, education, youth facilities, and green spaces. For more information, read the article “Voortgang ontwerp cultuurcluster Berlijnplein” (in Dutch).
How is the design created?
In 2021/2022, a consortium was selected to work on the design. The design is developed in close consultation with the municipality, partners at the square, and the neighbourhood. Co-creation is an important pillar in creating the design.
What is the timeline for the realisation of Berlijnplein?
In 2021, the tendering process began to select a consortium, and the awarding took place at the end of 2021/early 2022. The preliminary plan is to start construction in 2025.
What will happen to the programme at Berlijnplein between now and 2025?
Berlijnplein will remain open throughout the entire design and construction period. Cultural organisations operate from temporary buildings, where experiences are already gained with circularity, and you can continue to visit the many exhibitions, theater and dance performances, and many other activities. This phased approach to new construction has been taken into account.